Construction company org chart example

A general contractor drawn as two lines that meet on every job: the office line that owns the budget and the schedule, and the field line that owns the site. Where they meet is a dotted line, and every construction chart has it whether it's drawn or not.

Daniel TarrowPresidentKaren OseiVP of OperationsSteve MarchettiDirector of Project ManagementLily ChenProject ManagerAndre BaptisteProject ManagerSophie LundProject EngineerRamón IbarraGeneral SuperintendentTerry KowalskiSuperintendentMiguel SantosForeman, ConcreteJamal HinesCarpenterDave BrennanLabourerAlicia FerreiraSuperintendentKen WatanabeForeman, FramingLuis PeñaCarpenterAhmed SiddiqiEquipment OperatorWalt JensenEquipment & Yard ManagerRay CastilloEquipment MechanicNora HalloranChief EstimatorVikram RaoEstimatorClaire DuboisEstimatorHank MorrisonSafety DirectorBeatriz AlmeidaControllerMarcus ReedAP & Payroll ClerkJanet KimOffice Manager
Tarrow Brothers Construction · 24 people · an invented company, drawn by the layout engine. Project management and field operations as separate lines under one VP. Each superintendent's dotted line runs to the project manager they are paired with; crews are stacked under their foreman; safety reports to the president.

How a construction company is usually structured

A contractor's org chart is its home structure — the stable one that people belong to between projects. Every job then borrows from it: one project manager, one superintendent, and the foremen and crews the job needs. That's why the chart has two lines under the VP of operations: project management (the office) and field operations (the site), meeting at the project.

The project manager owns the contract, the budget, the schedule and the client; the superintendent owns the site, the crews, the subcontractors on the ground and the daily log. In small firms the super reports to the PM. In firms past about fifty people the field line usually gets its own head — a general superintendent — and the pairing per project becomes a dotted line, which is what's drawn here.

Preconstruction (estimating) reports high, often to the president, because the estimate is where a contractor wins or loses money before a shovel moves. Safety reports to the top for the same reason quality does in a plant: the person who can stop work must not report to the person who pays for the delay. Equipment and the yard belong to operations.

Typical titles by level

The vocabulary these charts use, from the top down. Titles vary by country and by company; the levels don't.

LevelTitles you'll see
LeadershipPresident or Owner, VP of Operations, sometimes a VP of Preconstruction
OfficeDirector of Project Management, Senior Project Manager, Project Manager, Assistant Project Manager, Project Engineer, Chief Estimator, Estimator, Contracts Administrator
FieldGeneral Superintendent, Superintendent, Assistant Superintendent, Foreman, Lead Hand
Crew and supportCarpenter, Labourer, Equipment Operator, Ironworker, Electrician (self-performed trades), Equipment Mechanic, Yard Manager, Safety Officer, Controller, AP & Payroll Clerk, Office Manager

Where these charts go wrong

The usual failures: the owner as the hub of a fifteen-spoke wheel because nobody is allowed to hire a VP; estimating buried under a project manager; safety reporting to the person whose schedule it slows; and the company chart redrawn for every job until nobody knows who they actually work for.

Questions people ask

Does the superintendent report to the project manager?
In small contractors, yes — the PM is the senior person on the job and the super runs the site for them. Past roughly fifty employees most firms split the lines: supers report to a general superintendent, PMs to a director of project management, and each project pairs one of each. Draw the pairing as a dotted line so it's visible without pretending it's a reporting line.
Where do subcontractors go on a construction org chart?
Not on the company chart, unless you direct their people daily. A project chart can list the subs' foremen under your superintendent for that job; the company chart shows only who you employ, plus contractors you manage directly.
How do you chart a company organised by project?
Keep two kinds of chart. The company chart is the home structure (this one) and changes rarely. Project charts are made per job, from the same people, and thrown away when the job closes. Trying to make one chart do both is why construction charts are never up to date.
Who should the safety director report to?
The president or owner, with a dotted line to operations. Safety needs the authority to stop work, and that only holds if the safety lead doesn't answer to the person responsible for the schedule.

Make it yours

Download the spreadsheet, replace the names, import it — the chart redraws itself. Or start empty and drag people until it's true. Building is free at any size.